    轻质隔墙板在安装的时候是需要进行拼接的,但是在拼接的时候如果没有技巧,没有经验的情况下,在拼接后是会出现问题的,常见的问题就是不平整,或者是出现裂缝,墙面上有很大的缝隙,这样一来不但影响正常的使用,还十分影响墙面的美观性,所以轻质隔墙板在安装的时候一定要避免出现缝隙,那么应该怎样避免呢?
    Light partition boards need to be spliced during installation, but if there is no skill and experience in splicing, problems will occur after splicing. The common problem is uneven, or cracks, and there are large cracks on the wall, which will not only affect the normal use, but also greatly affect the beauty of the wall, Therefore, cracks must be avoided during the installation of light partition board, so how should they be avoided?
    1、实际上轻质隔墙板在进行拼接时多少都会有一些缝隙,但是安装质量好的情况下缝隙是非常小的,所以如果轻质隔墙板出现损坏现象时,施工的墙体中缝隙可能会更大,所以这时候我们就有必要将其作为隔断板进行封堵。
    1. In fact, there will be some gaps in the light partition board during splicing, but the gap is very small when the installation quality is good. Therefore, if the light partition board is damaged, the gap in the construction wall may be larger, so it is necessary to block it as a partition board at this time.
    2、对于地面不平整,或者是板长的制作误差和梁、柱底面高度的模板误差,这种情况下轻质隔墙板的上下接缝一般在3-8厘米范围内,在接缝处可以用水泥砂浆、板头、砖块等硬物填充,使用水泥砂浆填充两板连接处时必须饱满、密实,还要挤出的多余砂浆并及时刮掉。另外换需要注意轻质隔墙板边调整处理槽必须在接缝处的水泥砂浆和墙板干透后抹灰时一起处理。
    2. For the uneven ground, or the fabrication error of plate length and the formwork error of beam and column bottom height, in this case, the upper and lower joints of light partition board are generally within 3-8 cm. The joints can be filled with hard objects such as cement mortar, plate head and brick. When filling the joint of two plates with cement mortar, it must be full and dense, The excess mortar shall be extruded and scraped off in time. In addition, it should be noted that the light partition board edge adjustment treatment tank must be treated together with the cement mortar at the joint and plastering after the wall board is completely dry.
    3、如果担心水泥砂浆黏合力不够的情况下,我们还可以采用聚合物黏结砂浆作为安装嵌缝砂浆,这种砂浆具有很强的粘接力和较强的韧性,硬化时不收缩,用于轻质建筑板材安装时可以不落浆,保证嵌缝砂浆饱满,增强嵌缝的粘接强度,抑制收缩应力的破坏作用,嵌缝砂浆自身不收缩减少收缩应力。
    3. If we are worried that the adhesive force of cement mortar is not enough, we can also use polymer bonding mortar as the installation caulking mortar. This mortar has strong adhesive force and strong toughness, does not shrink when hardening, and does not fall when used for the installation of light building plates, so as to ensure that the caulking mortar is full, enhance the bonding strength of caulking and inhibit the destructive effect of shrinkage stress, The caulking mortar does not shrink and reduces the shrinkage stress.
    轻质隔墙板
    Light partition board
    4、另外轻质隔墙发现在较长墙体施工安装过程中,建议在安装时每隔3~5米距离预留一处安装缝暂时不做处理,让此段墙体自由收缩7~10天,待收缩应力已基本释放、变形稳定后再用聚合物嵌缝砂浆将此连续接缝填实。这样可避免长墙累积收缩应力过大造成缝隙。
    4. In addition, it is found that during the construction and installation of the long wall, it is recommended to reserve an installation joint every 3 ~ 5m during installation, and do not deal with it temporarily, so that the wall can shrink freely for 7 ~ 10 days. After the shrinkage stress has been basically released and the deformation is stable, the continuous joint can be filled with polymer caulking mortar. This can avoid the gap caused by excessive accumulated shrinkage stress of long wall.
    5、选材也是很重要的,在选用板材前,深入各板材生产企业进行考察,了解其生产工艺、质量保证体系、材料临时堆放场地,以保证板材各项指标都符合国家标准、有足够的板材晾晒时间、保证材料的干燥,就是保证安装后正常使用的前提。
    5. Material selection is also very important. Before selecting plates, go deep into various plate production enterprises to investigate and understand their production process, quality assurance system and temporary material stacking site, so as to ensure that all indexes of plates meet national standards, have sufficient plate drying time and ensure the drying of materials, which is the premise to ensure normal use after installation.
    6、另外安装轻质隔墙板时,也会对门框造成影响,所以为避免门框上部倒八字裂缝,可在门框与长墙连接处,距门框两块板处预留一收缩缝暂不处理以释放应力,7~10天后再用聚合物水泥砂浆填实处理,遮阳就可以避免门框处出现缝隙。
    6. In addition, the installation of light partition board will also affect the door frame. Therefore, in order to avoid the inverted splay crack on the upper part of the door frame, a shrinkage joint can be reserved at the connection between the door frame and the long wall and at the two plates away from the door frame, which will not be treated temporarily to release the stress. After 7 ~ 10 days, it can be filled with polymer cement mortar to avoid the gap at the door frame.
    7、我们还要注意对轻质隔墙板根部处理。在条板施工安装完毕之后,派专人对立板根部检查,并用砼达到终凝之后,再拔掉木楔填细石砼,这样才能够保证正常安全使用。
    7. We should also pay attention to the root treatment of light partition board. After the strip construction and installation is completed, a special person shall be assigned to inspect the root of the opposite plate, and after the concrete reaches the final setting, the wooden wedge shall be pulled out and filled with fine aggregate concrete, so as to ensure normal and safe use.
    联系我们

    产品销售热线:18660816658

    技术方案咨询:18560211715

    仓库地址:济南市槐荫区河海工业园9号

    九江工厂:九江市江东大道3号

    台湾新竹工厂:台湾新竹

    泰国曼谷工厂:泰国曼谷

    关注我们
    山东创图建筑装饰工程有限公司 备案号:鲁ICP备14019259号-2 网站地图 XML TXT 鲁公网安备37010502002020号

    截屏,微信识别二维码

    微信号:18660816658